Agreement No. CE 35/2006(CE)

Kai Tak Development Engineering Study

cum Design and Construction of Advance Works –

Investigation, Design and Construction

 

 

Decommissioning of the Former Kai Tak Airport

Other than the North Apron

Environmental Monitoring and Audit Manual

 

Contents

 

1           INTRODUCTION.............................................................................................................. 1

1.1       Project Background............................................................................................... 1

1.2       Project Scope and Programme............................................................................... 1

1.3       Purpose of the Manual........................................................................................... 2

1.4       Project Organization.............................................................................................. 3

2           LAND CONTAMMINATION............................................................................................... 7

2.1       Introduction........................................................................................................... 7

2.2       Removal of Free Product Encountered during Excavation........................................... 7

2.3       Confirmation Sampling / Testing for Soil Excavation.................................................. 8

2.4       Confirmation Sampling / Testing for Biopiling.......................................................... 10

2.5       Confirmation Sampling / Testing for Solidification / Stabilization................................ 11

2.6       Environmental Mitigation Measures and Safety Measures........................................ 12

3           WASTE MANAGEMENT IMPLICATIONS......................................................................... 15

3.1       Introduction......................................................................................................... 15

3.2       Waste Control and Mitigation Measures................................................................. 15

4           WATER QUALITY IMPACT............................................................................................. 19

4.1       Introduction......................................................................................................... 19

4.2       Site Audits.......................................................................................................... 19

5           AIR QUALITY IMPACT................................................................................................... 21

5.1       Introduction......................................................................................................... 21

5.2       Methodology and Criteria...................................................................................... 21

5.3       Monitoring Equipment........................................................................................... 22

5.4       Monitoring Locations............................................................................................ 24

5.5       Baseline Monitoring.............................................................................................. 25

5.6       Impact Monitoring................................................................................................ 26

5.7       Event and Action Plan.......................................................................................... 27

5.8       Mitigation Measures............................................................................................. 31

 

 

 

6           NOISE IMPACT.............................................................................................................. 33

6.1       Introduction......................................................................................................... 33

6.2       Mitigation Measures............................................................................................. 33

7           IMPACT ON CULTURAL HERITAGE............................................................................... 35

7.1       Introduction......................................................................................................... 35

8           MARINE ECOLOGY IMPACT.......................................................................................... 37

9           SITE ENVIRONMENTAL AUDIT...................................................................................... 39

9.1       Site Inspections................................................................................................... 39

9.2       Compliance with Legal and Contractual Requirements............................................. 39

9.3       Environmental Complaints..................................................................................... 40

10         REPORTING.................................................................................................................. 41

10.1     General............................................................................................................... 41

10.2     Electronic Reporting of EM&A Information.............................................................. 41

10.3     Baseline Monitoring Report................................................................................... 41

10.4     Monthly EM&A Reports........................................................................................ 42

10.5     First Monthly EM&A Report.................................................................................. 42

10.6     Subsequent EM&A Reports.................................................................................. 44

10.7     Quarterly EM&A Summary Reports....................................................................... 46

10.8     Final EM&A Review Reports................................................................................. 47

10.9     Data Keeping....................................................................................................... 48

10.10   Interim Notifications of Environmental Quality Limit Exceedances............................. 48

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

List of Tables

Table 1.1           Summary of Construction Activities

Table 1.2           Summary of Project Programme

Table 2.1           Event and Action Plan for Removal of Encountered Free Product during Excavation

Table 2.2           Event and Action Plan for Confirmation Sampling / Testing for Soil Excavation

Table 2.3           Concerned Action Levels for Soil Excavation

Table 2.4           Event and Action Plan for Confirmation Sampling / Testing for Biopiling

Table 2.5           Concerned Cleanup Targets for Biopiling

Table 2.6           Event and Action Plan for Confirmation Sampling / Testing for Solidification / Stabilization

Table 2.7           Concerned Cleanup Targets for Solidification / Stabilization

Table 3.1           Summary of Waste Handling Procedures and Disposal Routes

Table 5.1           Proposed Air Quality Monitoring Locations

Table 5.2           Biopiling System Discharge Emission Monitoring Requirements

Table 5.3           Action and Limit Levels for Ambient Dust Monitoring

Table 5.4           Limit Levels for Plant Emissions Monitoring

Table 5.5           Limit Levels for Ambient VOC Monitoring at Site Boundary

Table 5.6           Event and Action Plan for Air Dust Monitoring

Table 5.7           Event and Action Plan for Biopiling System Discharge Emissions Monitoring and Ambient VOC Monitoring

 

List of Drawings

Drawing 1.1       Preliminary Outline Development Plan (PODP)

Drawing 1.2       Project Location

Drawing 1.3       Locations of Decommissioning / Decontamination Works

Drawing 1.4       Project Organization

Drawing 2.1       Contaminated Zones Proposed for Excavation

Drawing 5.1       Construction Dust Monitoring Locations

Drawing 9.1       Environmental Complaint Flow Diagram                                                                     

 

List of Appendices

Appendix A       Iimplementation Schedule of the Recommended Mitigation Measures

Appendix B       Data Record Sheet

Appendix C       Sample Template for the Interim Notification